Sitemap of IPESL Offshore Crane & Lifting Services Nigeria

LIEBHERR CBW SHIP CRANE SERVICE IN PORT HARCOURT

 

Our Costumer from Germany ordered us to repair a LIEBHERR CBW SHIP CRANE on the vessel MV MV HC NADJA-MARIA 


Our Costumer from Germany ordered us to repair a LIEBHERR CBW SHIP CRANE on the vessel MV MV HC NADJA-MARIA 
FOLLOWING PROBLEMS HE ADVISE: 
CRANE UNABLE TO CARRY MAXIMUM RATED TONNAGE – CBW 160981
CRANE BOOM DOESN´T RESPOND SOMETIMES – CBW160985


AFTER THE TROUBLESHOOTING OUR ENGINNERS RECOMMEND 

CBW160981

  • ·         Change the pump and winch hydraulic motor
  • ·         Attend to corrosion on the slewing motors
  • ·         Replace multi brake disc. Hoisting winch failed brake test as the winch still turns at 150bar despite closing the emergency brake valve.
 
CBW 160985
Denso tape should be used to cover the sealing surface of the ca switch to prevent water ingress.

The vessel will order the parts and complete the work in the Dry-Dock

If you need a repair service at your cranes on short notice.
Please contact us: Tobias@ipesl-mail.com
                                pflohr@ipesl-mail.com 



Return
Mär 5, 2019